HomeSporting GoodsSports & FitnessOther SportsBraided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m
product_image_name-Generic-Braided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m-1product_image_name-Generic-Braided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m-2product_image_name-Generic-Braided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m-3product_image_name-Generic-Braided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m-4product_image_name-Generic-Braided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m-5product_image_name-Generic-Braided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m-6product_image_name-Generic-Braided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m-7

Share this product

Shipped from abroad

Braided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m

UGX 120,347
UGX 204,58341%

In stock

+ shipping from UGX 24,359 to Central Business District
0 out of 5
(No ratings available)
Variation available

2offers starting fromUGX 120,347

See More Offers

Promotions

Delivery & Returns

Shipped from abroad 

Choose your location

Pickup Station

Delivery Fees UGX 24,359
Ready for pickup between 17 January and 22 January if you place your order within the next 9hrs 23mins

Door Delivery

Delivery Fees UGX 26,359
Ready for delivery between 17 January and 22 January if you place your order within the next 9hrs 23mins

Return Policy

Free return within 7 days for eligible items.Details

Seller Information

Syyxo Ysa

60%Seller Score

Be the first to follow

Follow

Seller Performance

This seller does not have enough history for us to evaluate his performance yet

OTHER SIMILAR OFFERS

UGX 120,851

Sold by: Jimmy Melissa | Seller Score: 60%

Product details

  • Model er: Braided Equestrian Lead Rope
  • Material:

Welcome to our store
Your support is our greatest motivation
All products in our store are sold at low prices and the quality is guaranteed
If you need it you can buy it with confidence
We must give you the most comfortable shopping experience
All product pictures in our store are taken by professional photographers
And carefully edited and color adjusted in post
and try to keep as close as possible to the actual product
But due to the different lighting angles
There may be color difference between the real object and the photo
The final color is subject to the actual product
All products are measured by hand
3 5mm measurement error may exist
Welcome to our store
The price of some products is already the lowest
We solemnly promise that we will as always bring high quality shopping services to all customers
A chance to trade is fate
Happy cooperation is the most important thing
If you are satisfied with your purchase
Please tell everyone
Let everyone know about us
Process Control
Continuous Improvement
Do it right the first time
and zero defect
Strive to be the best
Let you shop worry-free
Our products are carefully tested and carefully packaged
Your purchase will be our greatest encouragement
Welcome to my store
we have many kinds of price products
we launch new products every day
please follow my store and pay more attention
for more products
Please click on the seller information to enter our store to buy
we hope give you a pleasant shopping experience
Thank you and have a nice day
we feature many product lines
providing maximum choice and convenience to our discerning clientele
We also aim to provide an extensive range of high quality
together to our valued customers.
Our goal is always to provide our customers with stunning high quality products at down to earth pricesimageimageimageimageimageimage

Specifications

Key Features

  • Model er: Braided Equestrian Lead Rope
  • Material:

What’s in the box

1*horse racing

Specifications

  • SKU: GE779SE4I51BSNAFAMZ
  • Model: sm-415589
  • Production Country: China
  • Size (L x W x H cm): N/A
  • Weight (kg): 1
  • Color: 2 meters_WHITE
  • Main Material: plastic material
  • From the Manufacturer: Prohibit high temperature exposure
  • Warranty Address: N/A
  • Warranty Type: Repair by Vendor

Customer Feedback

This product has no ratings yet.

Braided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m

Braided Equestrian Lead Rope Heavy Nylon Long Lead Rope for Horse Pony Dog Donkey Cow Goat - 2/2.5/3m

UGX 120,347
UGX 204,58341%
Questions about this product?

Recently Viewed

See All