HomePet SuppliesDogsCollars, Harnesses & LeashesLeashesBasic LeashesDog Leash Reflective Long Lead Training Tracking Line Foam Handle Heavy Duty Pet Rope 2m 3m 5m 10m 15m 20m for Small/Large Dogs More
product_image_name-Generic-Dog Leash Reflective Long Lead Training Tracking Line Foam Handle Heavy Duty Pet Rope 2m 3m 5m 10m 15m 20m for Small/Large Dogs More-1

Share this product

Shipped from abroad

Dog Leash Reflective Long Lead Training Tracking Line Foam Handle Heavy Duty Pet Rope 2m 3m 5m 10m 15m 20m for Small/Large Dogs More

UGX 236,986
UGX 331,70329%

In stock

+ shipping from UGX 44,188 to Central Business District
0 out of 5
(No ratings available)
Variation available

Promotions

Delivery & Returns

Shipped from abroad 

Choose your location

Pickup Station

Delivery Fees UGX 44,188
Ready for pickup between 23 December and 28 December if you place your order within the next 17hrs 8mins

Door Delivery

Delivery Fees UGX 46,188
Ready for delivery between 23 December and 28 December if you place your order within the next 17hrs 8mins

Return Policy

Free return within 7 days for eligible items.Details

Seller Information

Shuodong

60%Seller Score

Be the first to follow

Follow

Seller Performance

This seller does not have enough history for us to evaluate his performance yet

Product details

Foam Handle

Description
A dog lead is used for no pull to ensure safety,for improving our experience walking with our pets. It can be used further for training purpose to train your dog recall,for off leash training and other obedience skills. JANPET long leash is a perfect choice for training and exercise your dogs. Our long lead check cord is made with high-durability rope,gentle on hand,with a heavy duty swivel hook and a soft padded handle for ultimate comfort,very suitable for in-field or at home training as daily walking,camping,hiking,swimming,beach,backyard playing with tennis balls.

Main Feature:
1, nylon durable
2. Outdoor tracking leash, suitable for training, climbing, hiking
3. reflective, safe to travel at night or in bad light
4, the hook can withstand 100 kg pulling force
5 , Comfortable foam padded handle

size reference :

S: Leash Length 2m, diameter 0.8cm/0.31"
M: Leash Length 3m, diameter 0.8cm/0.31"
L: Leash Length 5m, diameter 0.8cm/0.31"
XL: Leash Length 10m, diameter 0.8cm/0.31"
XXL:Leash Length 15m, diameter 0.8cm/0.31"
XXXL:Leash Length 20m, diameter 0.8cm/0.31"image


image


image


image


image


image


image


image


image

Specifications

Key Features

Foam Handle

Description
A dog lead is used for no pull to ensure safety,for improving our experience walking with our pets. It can be used further for training purpose to train your dog recall,for off leash training and other obedience skills. JANPET long leash is a perfect choice for training and exercise your dogs. Our long lead check cord is made with high-durability rope,gentle on hand,with a heavy duty swivel hook and a soft padded handle for ultimate comfort,very suitable for in-field or at home training as daily walking,camping,hiking,swimming,beach,backyard playing with tennis balls.

Main Feature:
1, nylon durable
2. Outdoor tracking leash, suitable for training, climbing, hiking
3. reflective, safe to travel at night or in bad light
4, the hook can withstand 100 kg pulling force
5 , Comfortable foam padded handle

size reference :

S: Leash Length 2m, diameter 0.8cm/0.31"
M: Leash Length 3m, diameter 0.8cm/0.31"
L: Leash Length 5m, diameter 0.8cm/0.31"
XL: Leash Length 10m, diameter 0.8cm/0.31"
XXL:Leash Length 15m, diameter 0.8cm/0.31"
XXXL:Leash Length 20m, diameter 0.8cm/0.31"

What’s in the box

1*package

Specifications

  • SKU: GE779LS41P3KNNAFAMZ
  • Model: avoid chenicals
  • Production Country: China
  • Size (L x W x H cm): 12 x 13 x 14 cm
  • Weight (kg): 1
  • Color: Black XL 10M

Customer Feedback

This product has no ratings yet.

Dog Leash Reflective Long Lead Training Tracking Line Foam Handle Heavy Duty Pet Rope 2m 3m 5m 10m 15m 20m for Small/Large Dogs More

Dog Leash Reflective Long Lead Training Tracking Line Foam Handle Heavy Duty Pet Rope 2m 3m 5m 10m 15m 20m for Small/Large Dogs More

UGX 236,986
UGX 331,70329%
Questions about this product?

Recently Viewed

See All